TECHNICAL SERVICES

OUR MANDATE

The services offered cover a wide range of activities such as:

  • Civil Engineering;
  • Architecture;
  • Emergency Management and Public Safety;
  • Five-year Plans on community assets;
  • Road Engineering;
  • Geotechnical Engineering;
  • Training & Maintenance Plans.

Regardless the scope of activities, our technical services are able to offer, with our knowledge and experience, professional expertise capable of providing the most competent support to Band Councils, while respecting their integrity.

The work by our technical services takes on many forms:

  • Land Surveying;
  • Preparing plans & Specifications;
  • Providing estimates;
  • Bidding scenarios;
  • Inspecting;
  • Project Management;
  • Supervising projects;
  • Feasibility studies;

The basis of our intervention mode can be characterized by the fact that our technical services rely on the knowledge acquired concerning communities and their existing environment. With a multidisciplinary approach, our technical services are able to offer Band Councils solutions to various problems by taking into account distinct aspects such as environmental impacts, maintenance, price/quality ratio, future development, etc.

DIRECTIVE BOARD

Denys-Bernard-1024x1024

DENYS BERNARD

GENERAL MANAGER
Always on the lookout for business opportunities, Denys sees to the development and growth of the organization. His vision allows W8banaki to effectively serve our communities according to our mission, but also to export our expertise to many Indigenous communities and private organizations. In addition, Denys plays, among other things, a representative role for the Nation. He supervises, manages and administrates the various funding programs, services and projects underway for W8banaki. He is also responsible for supervising staff and ensuring that institutional values and established performance requirements are met.
Louis-Jutras-1024x1024

LOUIS JUTRAS, ENG.

DIRECTOR - ENGINEERING
Louis is in charge of the engineering department within W8banaki's technical services. He manages the department's services, mandates and personnel while ensuring the quality of services provided to clients and partners. Louis also holds the position of project manager and developer on various engineering projects involving civil engineering, municipal engineering, and road engineering.
Maxime-Diamond-1024x1024

MAXIME DIAMOND

DIRECTOR - HOUSING & EMERGENCY MANAGEMENT
Maxime oversees the Housing and Emergency Measures (EMAP) departments within the Technical Services Department. He manages the services, mandates, and personnel of these two departments, while ensuring the quality of services provided to clients and partners. Maxime works in collaboration with various communities, mainly for construction, inspection, building evaluation and asset management projects. With his team, he ensures that the various needs of the communities in terms of emergency measures are met. In addition, Maxime regularly works on the development of various projects in collaboration with governmental levels.
Laura_Goujon_Carre_BUZZ9804

LAURA GOUJON

ASSISTANT DIRECTOR - HOUSING AND EMERGENCY MANAGEMENT
Holding a Master of Business Administration (MBA), Laura assists the Director of Housing and Emergency Management (EMAP) with the human and financial resource management of these two departments, while proactively contributing to the administration of various projects. She provides support for the execution of different mandates by planning the department's financial needs and assisting coordinators in carrying out their tasks, particularly in quality control of deliverables.

ENGINEERING

Benoit-Giguère-1024x1024

BENOIT GIGUÈRE, ENG.

PROJECT MANAGER
Having graduated from the University of Sherbrooke in Civil Engineering in December 2016, Benoit joined the W8banaki team shortly after graduation. He is responsible for design standards and the application of engineering calculations necessary for road development and repair projects. Benoit also possesses sound technical drawing skills.
Anthony_Beauchesne_Carre_BUZZ0866

ANTONY BEAUCHESNE, ENG.

PROJECT MANAGER
Antony graduated from the Université de Sherbrooke in Civil Engineering in December 2021. He also completed a DEC in civil engineering at the Cégep de Trois-Rivières in 2017. During his academic training, he was able to gain technical experience within several municipal organizations, a contractor as well as W8banaki. His previous experience is relevant to the design calculations related to the municipal engineering field as well as to the management of projects of any nature.
Karol-Ann_ Lalonde_Fraser

KAROL-ANN LALONDE FRASER, ENG.

PROJECT MANAGER
Karol-Ann graduated from the École de technologie supérieure (ÉTS) in August 2020. She completed a bachelor's degree in construction engineering during which she accumulated knowledge in structural and municipal engineering during her internships. These experiences allowed her to develop her project management skills, which will be greatly useful in her role as a construction project manager in the technical services department.
Francis_Landry_Grand_Conseil_carre

FRANCIS LANDRY, ENG.

PROJECT MANAGER
Francis has a degree in mechanical engineering from the Université de Sherbrooke. His versatility and dedication allow him to accomplish a wide range of mandates as a project manager in both the engineering and housing departments. His expertise will also be used to help the team in building inspections.
Cyrille-Cantin-1024x1024

CYRILLE CANTIN

CIVIL ENGINEERING TECHNICIAN
Cyrille Cantin graduated in Civil engineering from Cégep de Trois-Rivières in May 2014. After his studies, he moved into the field of building structure, where he was able to deepen his knowledge of the related standards. His great versatility later led him to work in the field of mechanical engineering. Thanks to this experience, Cyrille was able to perfect her mastery of computer-aided drawing and project management. In March 2019, he joined the W8banaki team where he acquired a good knowledge of road network, construction and surveying standards as well as site supervision.
Alexandre-Larouche-1024x1024

ALEXANDRE LAROUCHE

CIVIL ENGINEERING TECHNICIAN
Alexandre graduated from the CEGEP of Trois-Rivières in May 2017. During his studies, he was hired by the Ministère des Transports as a construction supervisor. Through his work, he acquired various experience such as contract management and work inspection. In April 2018, he joined the W8banaki team. Alexandre possesses good knowledge of road network standards, surveying and site supervision.
Kevin_Trudel_Carre_20220525_0003

KEVEN MARTEL

CIVIL ENGINEERING TECHNICIAN
Keven Martel graduated from the Cégep de Trois-Rivières in 2017. Having worked in a material quality control firm for 5 years, Keven has acquired a wealth of knowledge that allows him to develop various projects. Moreover, throughout his professional career, he had the chance to contribute both closely and remotely to many designs located in some of Quebec's indigenous communities.
Erika St Louis-840-WEB-300x300

ÉRIKA ST-LOUIS

CIVIL ENGINEERING TECHNICIAN
Having graduated from Cégep de Trois-Rivières in 2023, Érika is now putting her energy to good use in our organization, providing site supervision and designing various civil engineering plans.

HOUSING

Jean-Dumont-1024x1024

JEAN DUMONT

COORDINATOR - HOUSING
As a graduate of Collège F.X. Garneau in housing management techniques for First Nations, Jean coordinates the housing department at W8banaki. He also holds the position of Itinerant Housing Trainer (IHT). Jean has extensive experience in project management, estimating and teaching building techniques. Thanks to his wide range of skills, he has accumulated nearly 25 years of continuous specialized experience.
Pascal_Lupien_20220707_0001_carre

PASCAL LUPIEN

EMAP COORDINATOR
With over 20 years of experience in communications and marketing and a strong passion for project development, Pascal works on creating various plans and tools to promote EMAP’s services to communities through branding and digital platforms. As a coordinator, he is responsible for fulfilling the mission of the Emergency Measures Program, focusing on prevention, preparedness, response, and recovery in support of communities affected by disasters. He leads a team of emergency management specialists, liaison officers, and agents dedicated to daily disaster prevention through training programs designed to prepare communities to respond to emergencies and mitigate their impact, as well as emergency response during deployments.
GCNWA-Kim-145-WEB-300x300

KIM MARCOUILLER

HOUSING PROJECT MANAGERS COORDINATOR
Kim oversees the overall management of the Housing Department's projects in collaboration with the department's leadership, guiding project managers to optimize processes and ensure excellence in deliverables. She monitors key milestones and addresses challenges encountered during the project lifecycle. Her expertise in management enables her to handle multiple files simultaneously while providing daily support to the team in their endeavors.
Dany_Beaudoin

DANY BEAUDOIN

PROJECT LEADER - TRPA
Dany dedicates most of his time to the specific mandate entrusted to W8banaki by the Trois-Rivières Port Authority and the resulting team management. A structural and civil engineering technician by training, Dany oversees project management, as well as the design and execution of plans and specifications in the fields of structural and foundation work. With over 20 years of experience in engineering, architecture, and construction, Dany has led numerous projects involving design, drafting, and construction across various industrial sites.
Damien_Lavigne_carre

DAMIEN LAVIGNE

EMERGENCY MANAGEMENT SPECIALIST
Graduated in Prehospital Emergency Care in 2015, Damien has worked in the field of medical emergencies for seven years as a paramedic. As an Emergency Management Officer, these years of experience will be a great asset in his mandate to support the various First Nations communities in their need for emergency management.
Geneviève-Veilleux-1024x1024

GENEVIÈVE VEILLEUX, T.P.

PROJECT LEADER - ODANAK
Geneviève is responsible for construction projects undertaken within the Abenaki community of Odanak. She assists the Odanak Abenaki Council in defining needs and managing projects. Holding a diploma in Architectural Technology (DEC) since 2008, Geneviève has been working at W8banaki since 2009. As an architectural technologist, she is also in charge of designing, producing, and finalizing construction plans for various projects. In addition to actively participating in the management of ongoing projects, Geneviève is also responsible for managing CMHC grant programs.
Marilyne-Raposo-1024x1024

MARILYNE RAPOSO

ARCHITECTURAL TECHNICIAN
Marilyne graduated from the CEGEP of Trois-Rivières in May 2018 in Architecture Technology. She also completed a civil engineering degree from the same educational institution in 2014. She joined the W8banaki team during her studies, contributing to the drafting tasks of different projects, residential building design and inspections. Marilyne possesses a thorough knowledge of building standards.
Damien_Turcotte_20220627_0003_carre

DAMIEN TURCOTTE

BUILDING MECHANIC TECHNICIAN
Following his education in mechanical engineering at the Cégep de Trois-Rivières, Damien uses his skills in this field to analyze, design, optimize and estimate the multiple mechanical systems of the buildings under the responsibility of W8banaki.
Ken Dubé

KEN DUBÉ

CHARGÉ DE PROJETS EN HABITATION
Acting as a housing project manager, Ken's experience in project management enables him to manage several projects simultaneously, in addition to supporting the team in its day-to-day work.
GCNWA-André Beauchesne-245-Noir-WEB-300x300

ANDRÉ BEAUCHESNE

HOUSING PROJECT MANAGER
André has many years of experience in construction project management, enabling him to fully assume his role as housing project manager and contribute to the success of the W8banaki team.
man

JEAN-FRANÇOIS GERVAIS, ENG.

PROJECT MANAGER - TRPA
ean-François devotes most of his time to the mandates entrusted to W8banaki by the Trois-Rivières Port Authority. His management experience enables him to oversee multiple projects simultaneously while providing daily support to the team in their work.
Daniel-Sirois-1024x1024

DANIEL SIROIS

INSPECTION AND TRAINING MANAGER
Daniel has extensive construction experience and he currently works for W8banaki as a inspection and training manager. He also assists the engineering team in supervising construction or other related inspection work.
Benoit Gingras

BENOIT GINGRAS

BUILDING INSPECTOR
As a member of the Association des inspecteurs en bâtiments du Québec (AIBQ), Benoit performs inspections and produces reports related to the visits. He mainly cooperates with CMHC on various files.
GCNWA-Pierre-Luc Gélinas-848-WEB-300x300

PIERRE-LUC GÉLINAS

HOUSING INSPECTOR
As a member of the Association des inspecteurs en bâtiments du Québec (AIBQ), Pierre-Luc carries out inspections and produces inspection reports. He also works closely with CMHC on various projects.
Richard Huneault-935-300x300

RICHARD HUNEAULT

INSPECTOR-ESTIMATOR
With many years of experience in the construction field, Richard is able to bring his expertise to the job sites to ensure that everything meets current construction standards.
Steve Aucoin-WEB-300x300 V2

STEEVE AUCOIN

MAINTENANCE WORKER AND WORKSITE SUPERVISOR
Steeve's versatility means that W8banaki can entrust him with a wide variety of mandates, from manual labor to site supervision and everything in between.
Ralph_Blouin_20220512_0005_carre

RALPH BLOUIN JR

ESTIMATOR
With over 25 years of experience in construction project management, Ralph acts as an estimator for the organization. His versatility and vast knowledge allow him to be involved in a wide variety of projects.
Cléophée_Lachapelle

CLÉOPHÉE LACHAPELLE

ADMINISTRATIVE ASSISTANT
Cléophée joins the Technical services department as an administrative assistant. Her secretarial training combined with her previous work experience in administration enable her to effectively carry out her mandate, the purpose of the position being to support the Housing and Emergency Management Coordinator. Furthermore, as an Abenaki, she will be able to put her knowledge of the First Nation community to good use.
Sasha_Piche_Carre

SACHA PICHÉ

LOGISTICS AGENT
Sacha's mandate is to ensure the logistics of the technical services department. He is in charge of purchasing, inventory control and planning the team's trips so that they are as efficient as possible.
Nolka_O'Bomsawin_20220325_0005

NOLKA O'BOMSAWIN

EMERGENCY MANAGEMENT AGENT
With a decade of experience in the security field, Nolka's mandate will be to assist and provide appropriate support in various emergency situations within First Nations communities.
Guillaume Gagnon-WEB-300x300-Bleue

GUILAUME GAGNON

EMERGENCY MANAGEMENT AGENT
Joanie Buist_carre

JOANIE BUIST

LIAISON OFFICER
With a degree in anthropology/education/geography, Joanie is a member of the Emergency Management team (EMAP). Her experience in education and project management in forestry environments enables her to work together to establish and maintain transparent relations with Quebec's First Nations. She uses her strengths in program design and work organization training to plan and implement emergency management prevention, preparedness, response and recovery measures with First Nations.
GCNWA-FGauthier-056-WEB-300x300

FABIENNE GAUTHIER

AGENTE DE LIAISON PAGU
Coming from a social work background, Fabienne has extensive experience working with people to plan and implement emergency management prevention, preparedness, response and recovery measures for First Nations.
Karine_Paradis_carre

KARINE PARADIS

PROJECT MANAGER - MRC DES SOURCES
Karine devotes most of her time to the mandates entrusted to W8banaki by the MRC des Sources. Her training in building mechanics is utilized when estimating repairs and execution costs for our numerous projects. Her professional background is also leveraged in certain asset management mandates.
GCNWA-SBronsard-074-WEB-300x300

SÉBASTIEN BRONSARD

OCCUPATIONAL HEALTH AND SAFETY OFFICER
Sébastien is responsible for health and safety prevention both within our organization and in collaboration with our various partners. With 15 years of experience as a trainer, manager, and consultant in occupational health and safety in petrochemical plants, industrial construction, and all types of establishments, he supports and assists communities with their various OHS needs.
man

AUGUSTIN DESMEULES

PROJECT MANAGER - TRPA
Augustin devotes most of his time to the mandates entrusted to W8banaki by the Trois-Rivières Port Authority. His experience enables him to manage multiple projects simultaneously while providing daily support to the team in their work.
Guillaume-1499-WEB-300x300

GUILLAUME AUCLAIR

PROJECT MANAGER
Guillaume devotes most of his time to the mandates entrusted to W8banaki by the Abenaki community of Odanak. His experience enables him to manage multiple projects simultaneously while providing daily support to the team in their work.
man

INTERN

VACANT POSITION

OUR PROJECTS

WÔLINAK

  • 2008 – Extension of Tomakowa Street
  • 2009 – Construction of a 4-unit housing unit on Tomakowa Street
  • 2009 – New municipal garage
  • 2010 – Preparation of architectural plans of a single family residence
  • 2010 – Development of a pedestrian promenade on Leblanc Road
  • 2010 – Construction of a 4-unit housing unit on the Danube Boulevard
  • 2011 – Construction of a semi-detached building on Tomakowa Street
  • 2013 – Expansion of the GCNWA Administrative Offices - Phase I
  • 2014 – Enlargement of the Family Hall
  • 2014 – Arrangement of the Traiteur W room
  • 2014 – Development of des Pins Road
  • 2015 – Ecoduct for Serpentine turtles
  • 2015 – Culvert of Solinak Street
  • 2015 – Expansion of the GCNWA Administrative Offices – Phase II
  • 2015 – Parking of the GCNWA Administrative Offices
  • 2016 – Culverts on Mikowa Street
  • 2016 – Nolka Street Development - Phase I
  • 2017 – Nolka Street Development - Phase II
  • 2017 – Production of development plans for the construction of an indoor pool
  • 2018 – Infrastructure Vulnerability Study
  • 2020 – Aqueduct looping and paving of the access road to the public works garage
  • 2021 – Plans and specifications for the Grand Royal Wôlinak Casino parking lot

ODANAK

  • 2009 – Industrial Motel Construction - Phase I
  • 2010 – Construction of a 4-unit housing unit on Kizos Street
  • 2010 – Construction of the post-secondary institution Kiuna
  • 2011 – Construction of a 6-unit housing unit on Awassos Street
  • 2012 – Wastewater Treatment Plan
  • 2013 – Installation of a laboratory for water tests
  • 2013 – Construction of a 4-unit housing unit on Managuan Street
  • 2014 – Construction of a garage for the Environment and Land Office in Odanak
  • 2014 – Construction of the administrative offices of the Odanak Abenaki Council
  • 2014 – Expansion of the Health Centre
  • 2014 – Expansion of the Police Station
  • 2014 – Expansion of the Community Hall
  • 2014 - Parking of the new administrative offices of the Abenaki Band Council of Odanak
  • 2015 – Addition of a solar wall to the new administrative offices
  • 2015 – Expansion of the CPE Aw8ssisak
  • 2015 – Rehabilitation of the library
  • 2016 – Redevelopment of the post office
  • 2016 – Construction of a semi-detached on Managuan Street
  • 2016 – Abrasive storage dome for Public Works
  • 2016 – Development of Pakessos and Sips streets
  • 2016 – Development of a bicycle path for the Kiuna Institution
  • 2016 – Major restoration at the Abenaki Museum
  • 2016 – Major restoration at the Community Hall
  • 2016 – Upgrading to CPE Aw8ssisak standards
  • 2016 – Managuan Street Extension ($80,000)
  • 2016 – Rainwater outfall reconstruction on Waban-Aki Street
  • 2017 – Industrial district infrastructure
  • 2017 – Industrial Motel Construction - Phase II
  • 2017 – Yellow perch spawning ground (Project Management)
  • 2017 – Construction of a new Public Works garage
  • 2018 – Expansion of the Kiuna Institution
  • 2018 – Infrastructure Vulnerability Study
  • 2019 – New Presbytery
  • 2019 – Plans and specifications for the construction of a new eco-centre
  • 2019 – Pakessos Road Development
  • 2019 – Abenaki Museum Trail
  • 2019 – Expansion of the 102 Sibosis
  • 2020 – Waban-Aki Street Paving
  • 2020 – Asban Street Rehabilitation
  • 2020 – Kiuna Bike Path Extension
  • 2021 – Mgezo Street Extension
  • 2021 – Swamp #2 Development Plan and Specifications

KANESATAKE

  • 2014 – Wastewater and drinking water
  • 2014 – Geothermal energy at the Immersion School
  • 2015 – Wastewater and drinking water (survey work)
  • 2015 – Drainage of Bonspille Rd.
  • 2016 – Rehabilitation of Angus Rd and Simon Rd roads
  • 2017 – Immersion School oil transfer area
  • 2017 – Drafting of plans and specifications for the rehabilitation of Arisawe Road
  • 2017 – Drafting of plans and specifications for the rehabilitation of Bruno Road
  • 2017 – Drafting of plans and specifications for the rehabilitation of Mountain Road
  • 2017 – Nicholas Road rehabilitation
  • 2017 – Flood Management
  • 2017 – Major Restoration at the high school (windows and ventilation)
  • 2018 – Plans for the Youth Center
  • 2019 – Wastewater and drinking water
  • 2019 – Construction of Mountain, Bruno and Arisawe Streets
  • 2019 – Management of the Emergency Power projects for the Band Council and the Kanesatake Human Resource Offices (KHRO)
  • 2019 – Flood Management
  • 2019 – Renovation & Redesign of the KHRO
  • 2020 – Paving of Guy, Richard, Joseph Swan streets and 3 parking lots

KAHNAWAKE

  • 2017 – Inspections of several buildings
  • 2018 – Redesign the conference room at the Band Council
  • 2018 – Inspection of the Social Services Department buildings
  • 2018 – Redevelopment plan for the Kahnawake Social Sercives Complex (KSCS) building
  • 2018 – Inspection of the 47 units of the social housing stock
  • 2019 – Project Management during the renovation of the 47 units in the social housing stock
  • 2019 – Inspection of a historic century-old building (Ross House)

LISTUGUJ

  • 2015 – Construction of the Public Works new garage
  • 2017 – Construction of an abrasive storage building
  • 2018 – Paving of 10 streets
  • 2018 – Flood Management
  • 2019 – Management & Supervision of the works following the floods
  • 2019 – Caplin Road
  • 2019 – Officer Creek flood
  • 2019 – Drinking Water Treatment Plant Rehabilitation Tender
  • 2020 – Aerated Pond Sludge Drainage
  • 2020 – Paving of Isaac and Triplex Streets
  • 2021 – Plans and specifications for the paving of 6 streets
  • 2022 – Plans and specifications for Riverside Street Extension and Listuguj Hills Development

GESGAPEGIAG

  • 2017 – Production of architectural plans for the GHRDC expansion
  • 2017 – Baieview Development
  • 2017 – Development of Lentug and Gasgusi roads
  • 2017 – Production of architectural plans for 7 single-family homes
  • 2017 – Production of architectural plans for a twin
  • 2017 – Production of architectural plans for a 6-plex
  • 2019 – Rehabilitation of the Drinking Water Plant
  • 2019 – Production of plans for the Public Works garage, the shopping centre and the butcher's shop
  • 2020 – Plans and specifications and supervision of the Bayview development
  • 2021 – Drinking Water Plant Upgrade
  • 2021 – Gasgusi Development Plans and Specifications

ISC (Indigenous Services Canada)

  • 2015 – Development of the SRCB Asset Condition Reporting System
  • 2016 – Distribution of smoke detectors to the communities and tribal councils
  • 2017 – Distribution of 2.5lbs fire extinguishers and carbon monoxide detectors to the communities and tribal councils
  • 2017 – Feasibility Study for pyrolysis at Unamen Shipu
  • 2018 – Development of the SRCB Asset Condition Reporting System
  • 2018 –  Inspection of three houses and management of the inspection project of 12 senior's residences
  • 2019 – Income Support

MANAWAN

  • 2017 – Building Inspection

BARRIERE LAKE

  • 2018 – Automation of blowers in aerated ponds
  • 2019 – Replacement of the wastewater pumping station
  • 2019 – Repairs on the wastewater collection system
  • 2019 – New Primary School - Phase I
  • 2019 – Drinking water treatment plant refurbishment
  • 2019 – Investigation of the drinking water distribution network
  • 2021 – Comprehensive infrastructure plan (water, sanitary and pluvial)
  • 2021 – Rehabilitation of all community streets
  • 2021 – Major repairs to an elementary school
  • 2021 – Rehabilitation of the softball field
  • 2021 – Shoreline Erosion Study

FNQLHSSC

  • 2017 – Inspection of several buildings on the communities
  • 2019 – Approval of Early Childhood center compliance plans and visits for certain communities in partnership with the Ministry of Family Affairs

OFF COMMUNITY

PARKS CANADA

Parc de la Mauricie

  • 2018 – Structural & Building inspection
  • 2018 – Management of the temporary repair of the Mistagance amphitheatre
  • 2018 – Inspection of the Halte du Marie
  • 2018 – Management of the temporary repair of the Halte du Marie

Fort Chambly

  • 2019 – Evaluation of renovations at the Fort Chambly Historic Site

OTHER PROJECTS

  • 2015 – Public Works and Government Services Canada - Rehabilitation of La Romaine Wharf
  • 2015 – Saint-Sylvère – Refurbishment of the 16e rang
  • 2015 – Saint-Sylvère - Optimization of the wastewater treatment system
  • 2015 – Saint-Sylvère - Deposhotation
  • 2015 – Sainte-Françoise - Parking for the multifunctional room
  • 2016 – Mont-Ham - Expansion of the main building
  • 2016 – Port de Trois-Rivières - Building Inspection
  • 2016 – Manseau - Level crossing
  • 2016 – Sainte-Françoise - Rehabilitation of various rows
  • 2016 – PureSphera Group - Concrete slab for industrial crusher
  • 2016 – PureSphera Group - Mezzanine for transformers
  • 2017 – MRC de Bécancour - Watercourse Management
  • 2017 – Saint-Sylvère – Rehabilitation of the 16e rang, Phase II
  • 2017 – Gentilly – Water Management at the Sûreté du Québec Station
  • 2017 – Gentilly – Repair of the Sûreté du Québec Station Building
  • 2018 – MRC de Bécancour –Watercourse Management
  • 2018 – Saint-Pier-les-Becquets –Drinking Water Management
  • 2019 – Sainte-Francoise – Inspection of the Multifunctional Hall
  • 2019 – Watercourse management in the MRC of Bécancour
  • 2020 – Watercourse management in the MRC of Bécancour
  • 2020 – Plans and specifications for the repair of a culvert in Sainte-Cécile-de-Lévrard
  • 2020 – Correctional paving in Sainte-Françoise
  • 2020 – Parisville Master Plan and new development
  • 2021 – Plans and specifications for paving repairs on Saint-Charles Road in Saint-Pierre-les-Becquets
  • 2021 – Watercourse management in the MRC of Bécancour

TYPE OF WORKS

  • Plans & Specifications
  • Project Management
  • Project Monitoring
  • Architecture
  • Civil & Municipal Engineering
  • Building Inspection (residential, institutional and commercial)
  • Building Evaluation (residential, institutional and commercial)
  • Redesign & Renovation Project Management (major and minor)
  • Institutional Interior Design
  • Property Assessments on First Nation Communities
  • Roadway
  • Etc.

CONTACT US